These last 2weeks I've been jumping between projects .
The first is these louvred windows that I am making for the Boathouse. They are western red cedar and there will 4 of these double openable windows and 3 single non-opening windows.
These windows have been a good stretch for my brain. Making templates for my router and trying to come up with the most eficient use of the table saw to quickly produce these.
This is veranda that Was built by the company I used to work for . But I have been commissioned to add studs and glaze the open end to make it a more useable room.
I'm just waiting for the glass now.
This is a two storey extension that I am building at the moment . It's very difficult to get a flattering photo as it is surrounded by scaffold. I am also waiting for some glass for this , then I can glaze the screen that you see below.